WebConstruction of Trunk Sewage Rising Main in Cheung Sha Wan (Public Works Programme Item No. 4421DS). The works include construction of about 1.7 kilometres of new sewage rising main from Cheung Sha Wan Sewage Pumping Station to Northwest Kowloon Preliminary Treatment Works and ancillary works. The works are scheduled to … WebDesign and Construction of Drainage Services Department Building at Cheung Sha Wan Sewage Pumping Station. Design and Construction of Redevelopment of Kwai Chung Hospital (Phase 2) at 3-15 Kwai Chung Hospital Road, New Territories. Shui On Construction Company Limited 2.
NOTE FOR PUBLIC WORKS SUBCOMMITTEE OF FINANCE …
WebLandscaping and Greening Works at Cheung Sha Wan Sewage Pumping Station (DSP/11/14) DSD: 2.498 Mil. Jun-2013: Soiling & Soft Landscaping Works & green roof: 104: Harbour Area Treatment Scheme Stage 2A - Upgrading of Preliminary Works at North Point, Wan Chai East and Central (DC/2009/23) WebConstruction Of Trunk Sewage Rising Main In Cheung Sha Wan The Works Include Construction Of About 1.7 Kilometres Of New Sewage Rising Main From Cheung Sha Wan Sewage Pumping Station To Northwest Kowloon Preliminary Treatment Works And Ancillary Works. The Works Are Scheduled To Commence In August 2024 For … jeansrock bonprix
CONTRACTS AWARDED IN DECEMBER 2024 NOTICE …
WebSS H503 (G.N. 2927) Prequalified Design and construction of Drainage Services Department Building at Cheung Sha Wan Sewage Pumping Station Shui On Joint Venture, 13/F., New Kowloon Plaza, 38 Tai Kok Tsui … Webeastward. The 675mm sewer is than merged with a 300mm sewer at the junction of Austin Road West and Lin Cheung Road. The merged 750mm sewer then runs northward along Lin Cheung Road and connects to the 1350mm trunk sewer at the north of Jordan Road. With reference to the sewerage design drawings for Contract 810B West Kowloon … WebCheung Sha Wan Sewage Pumping Station/ 31 December 2024 — 1] Note : [1] The APE has taken into account the returned tender price; thus the sum earmarked in the APE for the contract is the same ... upgrading of Cheung Chau sewage treatment and disposal facilities/ 17 November 2024 4439DS . Yuen Long Effluent Polishing Plant—stage 1 . jeansrock blau